Home/Export Packaging & Shipping
JANDISI BUILDING · PROJECT SUPPORT

Plan protection.
Plan the journey.

Discuss export packaging for aluminium windows and doors with the destination, handling method and delivery scope in view.

  • PackingCartons, crates, bracing, marking
  • RouteLCL, FCL or air, with loading photos
Timber export crates prepared for loading
Protected cartons and braced units staged before packing
PACKAGING

Packaging matched to the order.

Small orders ship as protected cartons; glazed units travel braced in timber crates; full containers are blocked and strapped. The method is chosen from the product, the route and how the site will unload.

  • Corner and surface protection on every frame
  • Glazed units braced in timber crates
  • Carton marks by model and elevation
TRANSPORT

Transport planned with the order.

Tell us the destination port and how the site receives — forklift, crane, hand unload — and we plan loading accordingly. Packing lists and loading photos go out before the vessel sails.

Container loading plan checked against the packing list
Timber crates marked in arrival order for site unloading
ON ARRIVAL

Receiving, storage and installation.

Cartons are marked so the first unit the site needs is the first one off the truck. Store frames dry, upright and off the ground; installation details and hardware are bagged per opening.

LET'S DISCUSS YOUR PROJECT

Start with an opening.
We'll work through the details.

Send your drawings, dimensions or reference images.